Our Massive To-Do List
Pending Projects (in no particular order):
GUEST BATH
-Hang TP holder (8/25/05)
-Hang towel rods / hooks (8/26/05)
-Hang clock (8/27/05)
-Re-spackle areas (thanks, Ry's mom! 8/23/05)
-Touch up paint (9/05/05)
- Re-paint ceiling w/ semi-gloss
-Finish painting door (8/23/05)
- Tile around window
-Grout around marble sill (thanks, Dad! 8/05)
- Find or buy then install ceiling vent cover
-Order vanity cabinet (8/13/05)
-Remove pedestal sink (8/21/05)
-Install vanity, sink, & faucet (8/22/05)
-Figure out baseboard situation (8/21/05)
-Install baseboards (12/01/05)
-Fill holes / paint baseboards (12/01/05)
-Remove old door knob / install new (9/04/05)
DOWNSTAIRS BATH
-Grout floor (thanks, Dad! 8/14/05)
-Stain grout...? (not gonna do...)
-Seal floor (9/04/05)
-Buy/install wainscoating (9/05/05)
-Buy toilet (9/05/05)
-Install toilet
-Install sink (after removing from guest bath)
-Buy vanity mirror (8/26/05)
- Hang vanity mirror / towel ring / TP holder
-Re-hang door
-Paint (after CHOOSING paint color...) (4 coats!!)
EVERYWHERE
- Paint trim (1/6 done)
- Install trim (1/6 done)
- Fill nail holes in trim (1/6 done)
- Paint 2nd coat on trim (1/6 done)
- Paint doors (two coats) (1-1/4 done)
-Pick out/order door knobs (8/26/05)
-Install door knobs
- Carpet upstairs
-Sweep/vacuum/clean (hope it lasts...8/14/05)
- Install wall jacks
-Hook up cable
- Hook up Cat-5
-Empty Jeep (8/1/05)
- Wash windows (2 left - thanks, Ry's mom!)
MASTER BEDROOM / MASTER CLOSET
-Fill holes in installed window trim (thanks, Heid! 8/26/05)
- Paint installed window trim (2 done)
-Paint ceiling (thanks, Annette! 10 or 11/05)
- Paint (after CHOOSING paint color...)
-Reorganize work zones
- Buy/install closet shelving
FOYER
- Paint stair risers
-Sand stairs (thanks, Heid! 8/24/05)
-Sand railing (thanks, Heid! 8/26/05)
- Stain/paint stairs
- Decide whether to paint or stain spindles
- Do whichever is decided
- Trim up the stairs (3/4 done. 8/24/05)
- Paint door, sidelights, and transom
- Figure out trim for above transom
- Do whatever is figured out
-Trim baseboards (8/14/05)
-Fill holes/paint baseboards (8/22/05)
UPSTAIRS HALL
- Paint 2nd coat of green
- Fix bathroom door trim paint against green (3/4 done. 8/25/05)
BEDROOMS
-Order/pick up closet doors from Lowes (8/26/05)
-Buy closet door frames (10 or 11/05)
- Install closet doors and door frames
-Respackle around vents (thanks, Ry's mom! 8/23/05)
-Touch up paint around vents (9/05/05)
-Install vent covers
- Buy/install closet shelving
OUTSIDE
-Put square blocks beneath garbage cans (thanks, Opa! 8/24/05)
-Erradicate gigantic weed pile (DONE!! 8/17/05)
- Weed the driveway (1/2 done. 8/17/05)
-Weed "patio" (save tomatoes!) (thanks, Opa! 8/24/05)
- Weed mulched beds...
-Restake tomatoes and peppers in garden (8/15/05)
-Stake tomatoes in backyard (thanks, Oma & Opa! 8/24/05)
-Spray all tomato plants w/ deer repellent (not worth it now...)
-Bring old fence w/ posts to dump (et al) (8/13/05)
-Empty trailer of weeds at dump
- Pick up load of mulch in trailer
- Finish mulching yard
- Get rocks from Barbara's yard (3/4 done. 7/05)
- Add rocks from Barbara's onto rock wall (1/2 done, 7/05)
- Add rocks from Joe's onto rock wall
- Figure out what to use for patio floor
- Do whatever is figured out
-Paint columns (thanks, Heid! 8/26/05)
- Scrape foundation
- Paint foundation
- Finish priming fence
- Paint fence
- Resize front rock wall to make room for driveway
BASEMENT
-CLEAN UP (11/26/05)
-Clean/tape/fold tarps & return to Opa (throw them out instead...11/26/05)
-Reorganize (11/26/05)
- File
LIVING ROOM / BACK HALL
-Trim baseboards (8/14/05)
-Fill holes / paint baseboards (8/24/05)
- Trim windows
- Set up office (1/2 done)
-Move bookshelves to dining room
- Get piano from mom & dad's
-Finish painting (thanks, Lori! 7/05)
-Take down door bell / install new door bell
-Get plant from Barbara's
- Install window trim (3 of 5 sills/sides installed. 12/05)
- Paint/fill holes in window trim (1 done. 12/05)
DINING ROOM
- Panel bottom of walls
- Paint panelling white
-Paint top of walls blue (thanks, Lori! 8/10/05)
- Shadow stripe blue
-Trim baseboards (8/14/05)
-Fill holes / paint baseboards (thanks, Heid! 8/23/05)
- Trim / paint window trim (3 of 3 installed. 12/05)
-Bring in bookshelves / set up bookshelves
KITCHEN
-Order cabinets (8/18/05)
-Remove old cabinets (8/24/05)
-Take old cabinets to the dump
-Remove/save kitchen faucet/sink (8/25/05)
-Install cabinets (DONE!)
-Trim cabinets (DONE! 9/04/05)
-Buy kitchen sink
- Install kitchen sink / install faucet (temp sink/faucet installed)
- Buy/install garbage disposal / hook up wiring
-Buy dishwasher/microwave (10/10/05)
-Hook up microwave wiring
- Run line for dishwasher / hook up wiring
- Choose countertops (working on it...)
- Have countertops installed
- Choose flooring (working on it...)
- Have flooring installed
-Run air duct out of cabinet kick plate
- Buy/install kick plate vent cover
- Paint (after CHOOSING paint color...)
- Choose/buy tile for backsplash
- Tile backsplash
- Choose/buy pendant lighting / move necessary ceiling boxes
-Buy under cabinet lighting / hook up wiring
-Buy pantry door (8/26/05)
-Install/paint pantry door
- Paint two exterior doors
- Fill holes / paint trim
- Build barrel arch b/t kitchen & dining room
- Build bench seating area
MASTER BATH
-Finish screwing down hardibacker
-Pick out floor tile
-Tile floor (thanks, Dad!)
- Grout floor
- Seal grout on floor
- Pick out wall tile
- Tile walls
- Grout walls
- Seal grout on walls
-Order vanity cabinet (8/13/05)
-Install vanity cabinet
-Choose/buy/install sink
- Choose/buy/install toilet
-Build hot tub apron (Buy from Home Depot instead)
- Install hot tub apron
- Build hot tub access panel in Master Closet
-Finish spackling over shower (1/2 done. 8/26/05)
- Finish priming
- Paint (after CHOOSING paint color...)
GUEST BATH
-
-
-
-
-
- Re-paint ceiling w/ semi-gloss
-
- Tile around window
-
- Find or buy then install ceiling vent cover
-
-
-
-
-
-
-
DOWNSTAIRS BATH
-
-
-
-
-
-
-
-
- Hang vanity mirror / towel ring / TP holder
-
-
EVERYWHERE
- Paint trim (1/6 done)
- Install trim (1/6 done)
- Fill nail holes in trim (1/6 done)
- Paint 2nd coat on trim (1/6 done)
- Paint doors (two coats) (1-1/4 done)
-
-
- Carpet upstairs
-
- Install wall jacks
-
- Hook up Cat-5
-
- Wash windows (2 left - thanks, Ry's mom!)
MASTER BEDROOM / MASTER CLOSET
-
- Paint installed window trim (2 done)
-
- Paint (after CHOOSING paint color...)
-
- Buy/install closet shelving
FOYER
- Paint stair risers
-
-
- Stain/paint stairs
- Decide whether to paint or stain spindles
- Do whichever is decided
- Trim up the stairs (3/4 done. 8/24/05)
- Paint door, sidelights, and transom
- Figure out trim for above transom
- Do whatever is figured out
-
-
UPSTAIRS HALL
- Paint 2nd coat of green
- Fix bathroom door trim paint against green (3/4 done. 8/25/05)
BEDROOMS
-
-
- Install closet doors and door frames
-
-
-
- Buy/install closet shelving
OUTSIDE
-
-
- Weed the driveway (1/2 done. 8/17/05)
-
- Weed mulched beds...
-
-
-
-
-
- Pick up load of mulch in trailer
- Finish mulching yard
- Get rocks from Barbara's yard (3/4 done. 7/05)
- Add rocks from Barbara's onto rock wall (1/2 done, 7/05)
- Add rocks from Joe's onto rock wall
- Figure out what to use for patio floor
- Do whatever is figured out
-
- Scrape foundation
- Paint foundation
- Finish priming fence
- Paint fence
- Resize front rock wall to make room for driveway
BASEMENT
-
-
-
- File
LIVING ROOM / BACK HALL
-
-
- Trim windows
- Set up office (1/2 done)
-
- Get piano from mom & dad's
-
-
-
- Install window trim (3 of 5 sills/sides installed. 12/05)
- Paint/fill holes in window trim (1 done. 12/05)
DINING ROOM
- Panel bottom of walls
- Paint panelling white
-
- Shadow stripe blue
-
-
- Trim / paint window trim (3 of 3 installed. 12/05)
-
KITCHEN
-
-
-
-
-
-
-
- Install kitchen sink / install faucet (temp sink/faucet installed)
- Buy/install garbage disposal / hook up wiring
-
-
- Run line for dishwasher / hook up wiring
- Choose countertops (working on it...)
- Have countertops installed
- Choose flooring (working on it...)
- Have flooring installed
-
- Buy/install kick plate vent cover
- Paint (after CHOOSING paint color...)
- Choose/buy tile for backsplash
- Tile backsplash
- Choose/buy pendant lighting / move necessary ceiling boxes
-
-
-
- Paint two exterior doors
- Fill holes / paint trim
- Build barrel arch b/t kitchen & dining room
- Build bench seating area
MASTER BATH
-
-
-
- Grout floor
- Seal grout on floor
- Pick out wall tile
- Tile walls
- Grout walls
- Seal grout on walls
-
-
-
- Choose/buy/install toilet
-
- Install hot tub apron
- Build hot tub access panel in Master Closet
-
- Finish priming
- Paint (after CHOOSING paint color...)
5 Comments:
This comment has been removed by a blog administrator.
This comment has been removed by a blog administrator.
This comment has been removed by a blog administrator.
This comment has been removed by a blog administrator.
This comment has been removed by a blog administrator.
Post a Comment
<< Home