Latest To-Do List
Master Bath
-Finish spackling over screws on shower ceiling
-Paint shower ceiling Needs 2nd coat
-Finish tiling Thanks, Dad!
-Grout floor
-Grout walls outside of shower
-Grout walls in shower below border Thanks, Dad!
-Grout walls in shower above border Thanks, Dad!
-Install toilet/tank
- Install faucet hardware - Almost done...waiting for parts
-Install shower hardware
-Caulk all seams
- Install shower doors - Using temp. curtain rod for now!
- Install chair rail above tile on walls around tub
-Purchase/hang shelves above tub
- Purchase/hang vanity mirror
- Purchase/hang towel and TP holders
-Rehang bathroom door and cabinet door
-Install tub apron
-Fill holes in door trim
-Paint door trim
Master Bedroom/Closet
-Paint walls (after choosing paint color!) Thanks, Mom H & Heidi!
-Sand baseboards
-Paint baseboards and window trim
-Finish spackling then paint old smoke detector hole in ceiling
- Purchase or build then hang closet shelving
-Remove all tools and trim from this room!
Guest Bath
-Grout window tile
-Scrape excess grout off floor tiles
-Scrape stickers off floor tiles =)
- Purchase or build then hang shelves above toilet
Upstairs Hallway
-Paint walls once more Thanks, Mom H!
-Fix doorway cut-ins! Thanks, Mom H!
-Paint attic trim
-Paint linen closet Thanks, Lori!
-Install brackets for shelves in linen closet
-Build, polyurethane, & install shelves in linen closet
- Purchase or build then install linen closet door
Yellow & Red Bedrooms
-Paint closet doors Thanks, Seth and Heidi!
-Paint then install closet door knobs
-Paint baseboards in red room once more Thanks, WaiMay!
Dining Room
- Shadow stripe top of walls (down to plate rail height)
- Purchase wall trim (up to plate rail height)
- Install/route wall trim
- Fill holes then paint all trim
1/2 Bath
-Spackle under window and around door
- Remove old chair rail
- Paint walls once more
- Install and paint new chair rail
- Hang mirror, TP holder, and hand towel ring
Kitchen
-Finish corner countertop
- Finish island countertop (or purchase then install butcher block)
- Run water line to fridge for water/ice maker - Roland coming!
- Try phosphoric acid on floor to remove excess grout
- Caulk around baseboards
- Finish sealing grout
-Install shoe molding b/t countertops and backsplash
-Touch up paint behind sink Needs another coat
Stairs/Front Hall
-Sand treads once more
-Stain treads, spindles, and banister
-Polyurethane treads, spindles, and banister 1 more coat!
- Paint risers
- Build trim over front door
Basement
- Sand treads
- Prime and paint stairs (or stain the pine instead???)
- Install baseboards on stairs - Almost done!
- Fill holes in and paint baseboards on stairs
- Connect humidifier water line - Roland coming!
- UNPACK BASEMENT!!! =) - Started! Thanks, Mom & Dad
- Clean basement once stuff is moved
- Buy or build then install kitty door
Entire Upstairs
-Clean up attic and back-fill insulation where necessary
-Clean plywood floor
-Empty out, then...
-Carpet!!
Entire Downstairs
- Touch up wood floors, then complete final sanding and polyurethane
Entire House
-Paint interior doors
-Plaster and touch up paint on walls where necessary
Exterior
-Remove plastic compressor base and install pavers
- Paint exterior doors
- Caulk/paint exterior trim
- Install new locks on rear doors (& perhaps on front door)
- Caulk/seal entire seam between foundation and siding
- Scrape/paint foundation
-Move wall around front right bed
- Widen driveway and add gravel
-Cut back bushes, especially forsythia
-Finish weeding and mulching
- Clean junk from driveway and side of house - Lots in trailer!
- Bring rocks/cement to dump - Already took one load
-Chop up and freeze biggest rhubarb stems Do again
-
-
-
-
-
-
-
-
- Install faucet hardware - Almost done...waiting for parts
-
-
- Install shower doors - Using temp. curtain rod for now!
- Install chair rail above tile on walls around tub
-
- Purchase/hang vanity mirror
- Purchase/hang towel and TP holders
-
-
-
-
Master Bedroom/Closet
-
-
-
-
- Purchase or build then hang closet shelving
-
Guest Bath
-
-
-
- Purchase or build then hang shelves above toilet
Upstairs Hallway
-
-
-
-
-
-
- Purchase or build then install linen closet door
Yellow & Red Bedrooms
-
-
-
Dining Room
- Shadow stripe top of walls (down to plate rail height)
- Purchase wall trim (up to plate rail height)
- Install/route wall trim
- Fill holes then paint all trim
1/2 Bath
-
- Remove old chair rail
- Paint walls once more
- Install and paint new chair rail
- Hang mirror, TP holder, and hand towel ring
Kitchen
-
- Finish island countertop (or purchase then install butcher block)
- Run water line to fridge for water/ice maker - Roland coming!
- Try phosphoric acid on floor to remove excess grout
- Caulk around baseboards
- Finish sealing grout
-
-
Stairs/Front Hall
-
-
-
- Paint risers
- Build trim over front door
Basement
- Sand treads
- Prime and paint stairs (or stain the pine instead???)
- Install baseboards on stairs - Almost done!
- Fill holes in and paint baseboards on stairs
- Connect humidifier water line - Roland coming!
- UNPACK BASEMENT!!! =) - Started! Thanks, Mom & Dad
- Clean basement once stuff is moved
- Buy or build then install kitty door
Entire Upstairs
-
-
-
-
Entire Downstairs
- Touch up wood floors, then complete final sanding and polyurethane
Entire House
-
-
Exterior
-
- Paint exterior doors
- Caulk/paint exterior trim
- Install new locks on rear doors (& perhaps on front door)
- Caulk/seal entire seam between foundation and siding
- Scrape/paint foundation
-
- Widen driveway and add gravel
-
-
- Clean junk from driveway and side of house - Lots in trailer!
- Bring rocks/cement to dump - Already took one load
-